KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  4-16-2014
Number of Hours:  1.00
Manual Reference:  Page 8-39
Brief Description:  Rudder pedal assembly #3

Removed the rudder pedal assembly, greased the critical areas, secured the assembly, torqued, and then added cotter pins where required.

Also added the grove brake reservoirs to the brake cylinder assemblies.

Rudder pedal assembly installed permantly to the aircraft.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.